Font Size
+
-

General Information

  • Permit is required.
  • Cost of permit is based on the value of the addition to be made. Estimated range is $40 - $80.
  • Instrument survey map or tape location map is required.
  • Detailed drawing of proposed car port required.
  • Two sets (2) drawings to include post size, span, lumber size, and how it is to be attached.
  • Set back will be reviewed.

You will need to visit the Technical Services Department at Greece Town Hall, One Vince Tofany Boulevard, Monday – Friday, 9 am – 5 pm, with the above to obtain your building permit and have any questions answered.